Skip to content

K-Sim® Cargo Product Carrier

Our Product Carrier model is based on a real double hull vessel. The model includes seven tank pairs, where one pair is SLOPs.

 Each tank pair has its own independent lines for loading/discharging as well as for Vapour Emission Control (VEC) and Inerting. Submerged hydraulically driven cargo pumps are fitted in each tank.

MODEL DESCRIPTION

For cleaning purposes clean-guns are fitted in each tank driven by two separate cleaning pumps able to clean with fresh water, salt water or cargo. Two separate ballast pumps and ejectors are fitted. Inert gas is made from flue gas or by the use of an inert gas generator, and run through a scrubber and onto the deck. The cargo temperature and density can be set individually. Water and sediments will fall out over time. Tank atmosphere data is calculated continuously. Tank atmosphere is shown graphically on a combustion diagram.

K-SIM® CARGO SCCII SUEZMAX CRUDE CARRIER

STCW REQUIREMENTS

The product carrier model meets the requirements of STCW section A-II/1, A-II/2, A-II/3, A-III/1, A-III/2, and A-V/1.
These sections cover:

Planning and ensuring safe loading

Care during the voyage and unloading of cargoes

Trim, stability, and stress to maintain seaworthiness of the ship

DNV GL CERTIFICATION

This model is certified and approved according to DNV GL’s Standard for Certification of Maritime Simulator Systems ST-033 March 2017.

TRAINING LEVELS

The simulator is suited for the following training:

  • Junior officers in basic cargo operations
  • Senior officers in full-scale cargo operations (loading/discharging/ cooling down /venting)
  • Senior officers and captains in advanced cargo-handling operations

MODEL FEATURES AND DETAILS

  • Dead-weight 83890 GRT
  • Length overall 228.60 m
  • Length bpp 218.70 m
  • Breadth moulded 32.24 m
  • Draught moulded 21.60 m
  • Summer draught 16.06 m

VESSEL DETAILS

  • Cargo tanks 14 – 2 are SLOPs
  • Discharge capacity 860 m3/h
  • Ballast pump 1100 m3/h
  • Vapour emission control: Yes
  • Number of cargo manifolds 7
  • Number of VEC manifolds 7

Note: Specifications subject to change without notice

TRAINING OBJECTIVES

The training objective of this model is to understand the total cargo-handling operation. Specific training objectives include the following:

  • Familiarization with all parts of the cargo system
  • Planning a cargo-loading or discharge operation using the LoadMaster load computer
  • Lining up for loading and ballast handling simultaneously (check atmosphere)
  • Simultaneous use of vapor emission control (VEC)
  • Controlling the flow into each tank and the trim/list of the ship
  • Topping up and finalizing loading
  • Preparing and lining up for discharge including inert gas plant
  • Starting up discharge from one or more tanks with one or more cargo types
  • Tank washing (setting correct pressure and washing angles)
  • Emptying and draining final tanks
  • Finalizing departure ballast
  • Heating cargo during laden voyage
  • Venting tanks for inspection/docking using an explosion diagram for each tank (included in the model)

SOUNDS INTERESTING?

Below we have listed some of our experts, which you can get in touch  with to learn more about how our solutions can support your business goals.

Wilhelm Mohr

VP Sales & Business Transformation

asraf ibRAHIM

Regional Sales Director Asia

MICHAEL MUTI

Regional Sales Director Americas

erik hovland

VP Strategic Projects & Sales Director Defense

LOURDES EVANS

Sales Manager Digital Services

susanne roth

Customer Success Manager Digital Services

Share this:

Like this:

Like Loading...

    Get in touch if you have questions about our products, how to get started or how to operate your assets smarter, safer, and greener.

    Yes, I would like to receive marketing emails from Kongsberg Digital AS about its products, services and upcoming events.

    By clicking submit below, you consent to the processing of your personal data for the purpose of receiving marketing emails from Kongsberg Digital AS. All personal data will be processed in accordance with the Kongsberg Privacy Policy. You can withdraw your consent at any time by clicking the opt-out link in the emails.

    %d bloggers like this: